Post Trenching Shallow Water Job

Bayu Constructor again complete another job successfully with Timas Suplindo in ENI Jangkrik field. This shallow water operation although seems difficult to do, but with some modification by our team, Bayu Constructor able to do the job very well. This is a 24 hours non stop crawling 1 month job and completed in April 2016.